0425 065 359Tap to call
A home EV charger installed beside a garage with a car plugged in
Tidy conduit run 7kW home charger Dedicated circuit
HiVoltElectrical
Taking bookings now · Burleigh to the Tweed

EV chargers, switchboards and fire systems. Done properly.

Licensed Gold Coast electricians covering Burleigh, Palm Beach, Currumbin and across the border. Ring us and you'll usually have an answer inside two business hours.

Fully licensed & insured Free quotes Residential & commercial
2 hrTypical time to come back to you, in business hours
3Licences held — electrical, contractor, QBCC
14Suburbs covered, Burleigh to the Tweed
Half a dayWhat most EV charger installs take
01
EV charger installation

Got an electric car coming?

A home charger is not a powerpoint. It needs a dedicated circuit, the right breaker, and often a switchboard that can actually handle it. We do the lot, and we tell you up front if your board needs work.

  • Any brand of chargerTesla, Zappi, Fronius, Ocular, or one we supply
  • Switchboard checked firstWe tell you before the job, not halfway through it
  • Single or three phaseIncluding upgrades where the supply allows
  • Compliance certificateIssued on completion wherever one is required
  • Apartments and strataWe'll talk to your body corporate
  • Workplace chargersFleet and customer charging for commercial sites

How an EV install actually goes

Most take a morning. The price is fixed before we start.

  1. Send a photo of your switchboardTen seconds of your time, and it tells us most of what we need
  2. We quote a fixed priceCharger, cable run and any board work, all in
  3. We install and test itUsually half a day, tidy cable runs, no mess left behind
  4. You get the paperworkCompliance certificate and a walk-through of how it works

Powerpoint, or a proper charger?

This is the question we get asked most. Here is roughly how much driving range each one puts back into the car per hour of charging.

A normal powerpoint10 amp · about 1.5–2 kW
Around 10–15 km of range an hour. Fine if you drive short distances and can leave it plugged in overnight. The outlet and the circuit behind it should still be checked first.
7 kW wall charger32 amp · single phase
Around 40–45 km of range an hour, roughly four times quicker. A fixed, weatherproof unit on its own dedicated circuit. This is what most homes end up with.
22 kW chargerthree phase
Up to around 70 km of range an hour — but only if the car can take it, and only if the street already supplies three phase.

The car sets the ceiling, not the charger. Most EVs cap their home charging somewhere between 7 kW and 11 kW, so the biggest unit is very often not the right one. Tell us what you drive and we will say which is actually worth the money — including when the answer is “stick with the powerpoint for now”.

Before you ask us for a number

What actually changes the price

Factor 01

Distance to the board

A charger on the garage wall beside the switchboard is the cheap version. A long run through a roof cavity is not.

Factor 02

The state of your board

If it needs upgrading before a charger can go on it, that is the single biggest swing in the number.

Factor 03

Single or three phase

Three phase opens up faster charging, but what is possible depends on what the street already supplies you.

Factor 04

The charger itself

Bring your own and we install it. Or we can supply one to suit the car and how you actually drive.

We don't publish a price here, because any number we put on a page would be a guess about your house. We work the four things above out first, then give you one fixed price before we start.

02
Where we work

Burleigh to the Tweed, and inland.

Based in Burleigh Heads, so the southern Gold Coast is our backyard. If your suburb is not on the list, ring anyway — we are probably nearby.

Burleigh HeadsBurleigh WatersMiamiPalm BeachCurrumbinElanoraTugunCoolangattaTweed HeadsBanora PointVarsity LakesRobinaMudgeerabaReedy Creek

Not listed? Call and ask — 0425 065 359.

Your own footage
03
60-second check

Is your switchboard ready for an EV?

Four questions. No email, no sign-up. It won't replace a sparky looking at it, but it will tell you roughly what you're in for before you ring anyone.

Answer the questions

Your result shows up here

Pick an answer to each of the four questions and we'll tell you what it probably means.

Question 01

What does the inside of your switchboard look like?

Question 02

Does it have safety switches (RCDs)?

Question 03

Where will the car be parked?

Question 04

Is the house single phase or three phase?

04
What we do

Everything electrical, plus safety.

From a dead powerpoint to a full commercial fit-out and fire board.

Warm lighting in a living room

Home electrical

  • Powerpoints, lights and fans
  • Renovations and full refits
  • Faults and troubleshooting
  • Sheds, pools and gazebos
Get a quote →
A modern switchboard with the cover off, showing new circuit breakers

Switchboards

  • Upgrades and rewires
  • Safety switch installs
  • Old fuse boards replaced
  • Ready for solar or an EV
Get a quote →
Smoke detector installed on a ceiling

Fire & safety

  • Interconnected smoke alarms
  • Landlord compliance
  • Testing and certificates
  • Emergency & exit lighting
Get a quote →
A finished commercial fit-out with linear LED lighting

Commercial

  • Shop and office fit-outs
  • Warehouse electrical
  • Fire board maintenance
  • Scheduled testing
Get a quote →
05
Recent work

Jobs we have finished.

Electrician working on an inverter
Switchboard & inverter work
Electrician working on a fire alarm box
Fire alarm panel
Living room lighting
Residential lighting
Electrician changing a light fitting
Light fitting replacement
Commercial electrical work
Commercial fit-out
Smoke detector
Interconnected smoke alarm

These are HiVolt's own job photos. The captions say what the job was — add the suburb to each one once you know where it was shot.

06
What happens next

No waiting around wondering.

Step 01

You ring or book

Tell us what is going on. A photo of the switchboard or the fault helps a lot.

Within 2 hours

We come back to you

With a real answer and a price, not a vague "we'll see". Quotes are free.

Often same day

We turn up

On time, in a marked ute, with the parts. We'll call if we're running late.

On completion

Tested and certified

Compliance certificate where one is required, and the site left clean.

07
What customers say

Straight from the jobs.

★★★★★
Asked for a quote and had a phone call back within two business hours, then the work was done the same day.
Jake C.From HiVolt's website
★★★★★
Prompt, tidy and easy to deal with. Explained what needed doing without talking down to me.
Simon J.From HiVolt's website
★★★★★
Great price and great work. Would happily have them back for the next job.
Jackie J.From HiVolt's website

Placeholder — to be confirmed. These three customers are carried across from HiVolt's current website, but the wording here has been shortened. Before this goes live they get replaced with the exact text from the original reviews. We don't write reviews and we don't buy them.

08
Book a job

Prefer not to call?

Fill this in and we'll come back to you, usually within two business hours. Free quote, no obligation.

Is it urgent or unsafe?

Burning smell, sparks, water near power, or no power at all — don't use this form. Ring 0425 065 359 now.

What do you need?
How soon?
Got a charger already?
Or call instead
✓

Ready to send.

Texting is easiest. Everything you just filled in is already written into the message — add a photo or two of the switchboard and hit send. We answer every one, usually within two business hours.

09
Common questions

The ones we get asked most.

Will my switchboard handle an EV charger?

Often yes, sometimes no. Older boards with ceramic fuses and no safety switches usually need an upgrade first. Send us a photo of your board and we'll tell you before we quote, not after we've started.

How long does an EV charger install take?

Most are a half-day job if the switchboard is in good shape and the cable run is straightforward. A long run through a roof cavity, or a board upgrade at the same time, can make it a full day.

What changes the price of an EV install?

Four things, mostly: how far the charger is from the switchboard, whether the board needs upgrading first, single or three phase, and the charger itself. We work all of that out before quoting, so the number we give you is the number you pay.

Do you charge for quotes?

No. Quotes are free, and the price we give you is the price you pay unless we find something genuinely unexpected — in which case we stop and ring you first.

Are you licensed and insured?

Yes. Electrical Licence 151591, Electrical Contractor Licence 88370 and QBCC Licence 1523961. They're at the bottom of this page, and we're happy for you to check them.

Do you do landlord smoke alarm compliance?

Yes. Queensland rules require interconnected photoelectric alarms in rental properties, and the NSW requirements across the border are different again. Tell us which side you're on and we'll install, test and issue the paperwork your agent needs.

What if it's an emergency?

Ring 0425 065 359 rather than filling in the form. If there's a burning smell, sparks, or water near power, turn the power off at the switchboard first if it's safe to do so.